LLDPE Flexible Membrane Liner
25 AC
Drainage Membrane
25 AC
Cover Soil
90,000 CY
The Landfill was constructed to serve the needs of a large-scale basin excavation that occurred over a 2-year time frame. The basin excavation exceeded 2M CY of CCR material, requiring multiple phases of landfill construction and closure. The landfill closure was accomplished with a traditional work scope including LLDPE liner, geo-membrane, final soil cover and engineered Hydro-Turf down chutes to carry water off the landfill slopes.
Download Case Study (PDF)Contact us today to see how our services can help you or your business. We’re able to answer any questions you have, provide a list of service offerings, and discuss future employment possibilities.
Want to learn more about Trans Ash? Visit our Markets & Solutions section, browse our Project Case Studies, or call us at 513-733-4770.