Articulated Concrete Block
17,000 SF
Aggregate
2,500 Tons
Pipe Rack Demolition
2,000 LF
As the result of a regulatory inspection, a Midwest utility was required to install two emergency spillways in existing CCR basins. The project included the reinforcement of existing spillways, site grading, road improvements, and modifications to process piping systems.