Articulated Concrete Block

17,000 SF

Aggregate

2,500 Tons

Pipe Rack Demolition

2,000 LF

Project Details

As the result of a regulatory inspection, a Midwest utility was required to install two emergency spillways in existing CCR basins. The project included the reinforcement of existing spillways, site grading, road improvements, and modifications to process piping systems.

Download Case Study (PDF)

Project Challenges & Solutions

Weather Management

To mitigate winter weather delays, additional equipment was mobilized to ensure proper compaction of material, and the work schedule was adjusted to include additional hours when the weather was favorable.

Excavation Challenges

To work around operational CCR basins, the basins were drawn down as much as possible to allow excavation while still keeping them in operation. Additionally, cofferdams were deployed in areas where the drawdown was insufficient.

Design Challenges

Design challenges were overcome through the use of GPS excavators with waterproof components. Trans Ash was able to install the aggregate below the water level, both safely and within design tolerances.

Contact the Team at Trans Ash for Your Next Project

Contact us today to see how our services can help you or your business. We’re able to answer any questions you have, provide a list of service offerings, and discuss future employment possibilities.

Want to learn more about Trans Ash? Visit our Markets & Solutions section, browse our Project Case Studies, or call us at 513-733-4770.