Bottom Ash Excavated
46,560 CY
Rock Excavated
12,640 CY
HDPE Liner
7 AC
Due to new regulations, a temporary lined basin needed to be constructed to accept plant, process water. To prepare the sub grade, bottom ash and rock were excavated and removed from the site. A concrete forebay and five, 36” HDPE pipes were constructed and installed to maintain water flow. The completion of the project was the first of the multiple phases required to clean close the remaining basins.